Audi 80/90/Coupe + 1.2. Identification of the car + 2. Engines, carburetors
3. Lubrication system + 4. Cooling system + 5. Fuel system + 6. Exhaust system + 7. System of ignition - 8. Transmission 8.1.2. A fork - the main cylinder of coupling 8.1.3. Press clutch plate 8.1.4. Malfunctions of coupling + 8.2. Mechanical transmission 012 + 8.3. Mechanical transmission 01A - 8.4. Automatic transmission 089 8.4.2. Lever and rope of the lever of gear shifting 8.4.3. Lock of automatic gear shifting 8.4.4. Mechanism of management of a butterfly valve 8.4.5. Removal and installation of the transmission 8.4.6. Check of the moments of gear shifting 8.4.7. Main transfer 8.4.8. Differential + 8.5. Automatic transmission 087 8.6. Dismantling and assembly of automatic transmissions 8.7. Block of valves + 8.8. Automatic transmission 097 + 9. Suspension brackets, wheels + 10. Brake system + 11. Steering + 12. Body, salon + 13. Air conditioning system + 14. Electric equipment
|
Switching lever gear shifting transfers / Rope
1. Plug 2. Spring 3. Gear shifting lever arm put a layer of AKD 512001 sealant between an arm and a casing of the transmission at installation 4. Gear shifting lever casing 5. The locking solenoid of automatic gear shifting 6. Switching rope arm 7. Sealing ring 8. Lock ring 9. Gear shifting rope 10. Angular arm of a rope of switching
|
11. Cover 12. Switch of bulbs of neutral, parking transfers and transfer of a backing 13. 8 N. of m. 14. Rope clip 15. The switching lever 16. Coupling 17. Plug 18. Lock ring 19. Spring 20. Centering pin 21. Gear shifting lever 22. Plug |
Prevention
Before work with the working engine, always move the gear shifting lever to situation P (parkings) and put the car on the emergency brake.
Disconnect a wire of the negative plug of the accumulator before work with any of elements of system of electric equipment.
It is necessary to press a brake pedal before the lever of gear shifting can be removed from parking transfer.
Do not bend and do not overwind a rope. Grease the ends of a rope before installation.
Installation / adjustment
PERFORMANCE ORDER |
1) delay fastening of a rope on a rope arm to 15 N. of m. |
2) establish a rope in a clip for a rope before installation of an angular arm |
3) move the gear shifting lever to situation P |
4) weaken a rope clip nut |
5) move the switching lever to situation P (back against the stop) |
6) tighten a rope clip nut to 8 N. of m. |
|
Mechanism of the lever of gear shifting and rope of gear shifting
1. Gear shifting lever handle 2. Gear shifting lever casing establish by designation P forward establish after adjustment of the electromagnetic switch 3. Electromagnetic switch 4. Cover 5. 5 N. of m. 6. The torsion spring 7. Plug 8. Washer 9. Lever switch gear shiftings check: the engine has to be started when the lever switchings is in the provision of P or N headlights of a backing have to light up at inclusion of transfer of a backing. If is not present, turn the switch in a nest and again check its work 10. Basis at installation put a layer of A/CD 512 001 sealant between the basis and a body 11. Clip bolt 12. Arm 13. Lock ring |
14. Gear shifting lever rope with a guide and the plug grease the ends of a rope before installation, tighten a nut of fastening of a rope on an arm to 15 N. of m. check that the going tube densely sat for adjustment move the gear shifting lever in situation P move the switching lever on the transmission in situation P (against the stop back) tighten a rope clip nut to 20 N. of m. 15. Cover 16. Coupling 17. Washer 18. Plug 19. Coupling 20. Boss 21. Spring clamp 22. 20 N. of m. 23. The switching lever 24. Washer 25. Plug 26. Compression spring install on the switching lever before installation of the directing pin 27. Plug 28. The directing pin 29. The gear shifting lever with a fork for locking of the lever in the provision of P or N |
Prevention
Disconnect a wire of the negative plug of the accumulator before work with any of car electric equipment elements.
Installation of an arm of the lever of gear shifting in relation to the gear shifting lever
PERFORMANCE ORDER |
|
1) install the probe A, 0.8 mm thick, between the lever of gear shifting and the electromagnetic switch |
2) press the electromagnetic switch to the probe and tighten a fastening nut |
3) after installation of the electromagnetic switch, establish the lower opening of a fork of the lever of gear shifting on the center and give tension on the switch |
4) the pin of the solenoid will close a fork |
| 5) establish a gear shifting lever casing so that the lever of gear shifting was opposite to a mark N in a casing (neutral transfer) |
|
6) install the lever A by means of a pin or a drill
In = a pin, with a diameter of 4.0 mm, inserted into a casing opening
|
7) switch the gear shifting lever to situation in situation N |
|
8) install the switch so that fastening (it is specified by an arrow) was fixed on the gear shifting lever |
9) tighten fastening bolts to 5 N. of m. |
10) remove a pin or a drill
|
|
After installation of the switch, check its work. |
|